Closing on a New Home in Horizon West or Winter Garden? What to Verify Before You Sign
Updated: Nov 10
Own Luxury Homes® Perspective
By Ryan Brown | Own Luxury Homes®
Before closing on a new home in Horizon West or Winter Garden, verify three separate things: the property's documented condition, the requirements of your purchase and financing agreements, and the warranty protection you will actually receive. A finished appearance, a passed government inspection and a builder's walkthrough list do not answer the same questions.
I personally sell real estate in Central Florida. My approach is to connect the homesite, paperwork and moving timeline before a buyer reaches the closing table. This guide provides a practical verification framework—not a certification of any builder, home or contract.

Start before signing the builder contract
Ask how independent inspections are scheduled, which construction stages can be accessed, what notice and insurance the inspector must provide, and whether a return visit is permitted. Obtain the policy and applicable contract provisions in writing. Do not assume the builder must offer every inspection stage or that an inspector can enter an active site without authorization.
Have a Florida real estate attorney explain inspection rights, objection deadlines, completion standards, delay provisions, deposit exposure and the consequences of refusing or postponing closing. Your agent can help organize questions and communications; legal interpretation belongs with your attorney. If you want your own representation, verify registration requirements before visiting or registering with a builder.
Use the correct local permitting record
Confirm the actual parcel and permitting authority rather than relying on the community name or postal address. Orange County and the City of Winter Garden publish separate building resources. For a county-issued permit, Orange County's Fast Track system allows permit and inspection research. Match the address, parcel and permit number before drawing conclusions.
Orange County explains that its building inspections address code compliance and that a new building must have the required certificate of occupancy before occupancy. It also states that issuance of a certificate does not approve a code violation. Ask the responsible building office to explain the record and any unresolved status.
Keep these closing documents separate
Build a closing file with the following five records. Each answers a different question; none substitutes for all the others.
1. Purchase agreement and amendments. These establish the agreed transaction terms. Request the complete signed set, including changes, selections and applicable completion provisions. Ask your attorney what must happen before closing and which deadlines apply.
2. Permit, final-inspection and occupancy records. Obtain the relevant official records from the builder or permitting authority. They concern regulatory status—not proof that every contracted selection or cosmetic item is correct.
3. Independent inspection report. Ask the inspector to identify findings, inaccessible areas and limitations. Florida's licensing guidance describes home inspection as a limited visual examination of readily accessible installed systems and components. A report is not a guarantee that concealed conditions do not exist.
4. Builder walkthrough list and written correction commitments. Record the specific item, location, photograph reference, builder response, intended completion date and how completion will be checked. Distinguish an observation from a repair the builder has actually agreed to perform. Have an attorney review any disputed commitment or proposed post-closing arrangement.
5. Warranty packet and claim instructions. Request the actual warranty, exclusions, start dates, notice procedure, administrator contacts and transfer terms. Keep appliance and equipment documentation separate from the builder's construction coverage.
Turn the punch list into a follow-up record
A useful punch list is more than blue tape or a verbal assurance. For each issue, preserve the inspection reference, the builder's written response and the next action. Ask your inspector which findings call for specialist evaluation or reinspection; do not make your own technical safety determination from a photograph.
If work remains near closing, raise it promptly with your agent, attorney, lender and settlement professional as appropriate. Ask what the agreement requires and whether a documented solution is acceptable to everyone who must approve it. Do not assume that you may unilaterally delay closing, withhold money or require an escrow. Those decisions can carry contractual and financing consequences.
The Consumer Financial Protection Bureau recommends a final walkthrough before signing to confirm agreed repairs and included items. If something differs, contact the seller immediately. A walkthrough is a final comparison with the agreement, not a replacement for an earlier professional inspection.
Understand Florida's one-year warranty correctly
Florida Statutes section 553.837 requires qualifying newly constructed homes to be warranted for builder-furnished construction defects of equipment, material or workmanship that result in a material violation of the Florida Building Code. Its definition covers previously unoccupied single-family dwellings, duplexes, triplexes and quadruplexes. Do not automatically apply this provision to every condominium or housing type.
The statutory period is one year after original conveyance to the initial owner or initial occupancy, whichever occurs first. Appliances or equipment covered by a manufacturer warranty fall outside the required coverage described in subsection (2). The statute also identifies exclusions, including normal wear and tear, normal settling within generally acceptable trade practices, and specified damage or work outside the builder's responsibility. It is not a promise that every cosmetic concern is a covered statutory defect.
The builder must comply for the full required initial year even if the home changes owners. A resale does not restart that year. A qualifying express written warranty can supersede statutory provisions under the conditions in subsection (3); request the actual document and obtain legal advice about its application. Do not assume a marketing phrase such as '1–2–10 warranty' describes every builder's coverage, exclusions or claim procedure.
For a nearly new resale, obtain the original conveyance and occupancy dates, warranty documents and claim history. Ask the warranty provider to confirm remaining protection and any transfer requirements. Longer coverage is not automatically transferable simply because the initial statutory protection follows the home during the required first year.
Review the money separately from the repairs
For most mortgages, the CFPB explains that borrowers must receive the Closing Disclosure at least three business days before closing. Compare it with your most recent Loan Estimate and reconcile loan terms, points, credits, cash to close and payment assumptions with the lender. Request the other closing documents in advance rather than treating the disclosure as the entire closing packet.
For a builder incentive tied to a closing deadline, confirm the written eligibility terms and what happens if completion or financing timing changes. A promotion should not be treated as a substitute for resolving a property or contract question. Verify closing-fund instructions through a previously confirmed contact method; the CFPB warns about scammers impersonating transaction professionals with last-minute wiring changes.
Your final readiness check
Before signing, be able to identify the signed agreement and amendments; the correct permitting and occupancy records; the inspection findings and limitations; the status of agreed corrections; the warranty documents and start dates; and the lender-confirmed closing figures. Keep unresolved items visible, with a responsible professional and a follow-up deadline. An unanswered question is not the same as an item cleared for closing.
Discuss your new-home plans with Ryan Brown
Considering new construction in Horizon West or Winter Garden? Contact Ryan Brown at Own Luxury Homes® to discuss the community or homesite, your purchase stage and your moving timeline. Start with the property you are considering, whether you have signed a contract, the expected closing date and the question you need answered.
Ryan's role is local real estate guidance and representation. Your inspector evaluates the agreed inspection scope, your lender confirms financing, the permitting authority explains its records, and your attorney advises on legal rights and obligations. Do not email account numbers, Social Security numbers or unredacted financial applications.
Own Luxury Homes® | 407-900-7030 | ryan@OwnLuxuryHomes.com
Sources reviewed November 7, 2026. General educational information, not a legal opinion, inspection report, mortgage commitment or property-specific certification. Contracts, applicable law, warranty documents and actual property records control the relevant questions.
Own Luxury Homes® is America’s Luxury Network for fine homes and luxury properties—where every client is treated like a million-dollar client.
Florida real estate services are provided by Own Luxury Homes LLC. In other states, real estate services are provided through independent local brokerages and appropriately licensed professionals. Brokerage relationships, service availability, and required disclosures vary by location.


Comments